Infrastructure build cost is defined by infra column dcost (struct sctintrins member in_dcost). It's the cost per point of efficiency. In contrast, sector and unit build cost is defined for 100%, by sect-chr, ship-chr, plane-chr, land-chr, nuke-chr column cost. Switch to build cost per 100%, for flexibility and consistency: replace struct sctintrins member in_dcost by in_cost, and selector dcost by cost. With cost values that aren't multiple of 100, the build cost may have to be rounded. Do this exactly like we round sector build cost: the amount is limited to money * 100 / cost rounded down, but the money charged is actual amount * money / 100 rounded randomly. Do the same for mobility use: replace struct sctintrins member in_mcost by in_bmobil, and selector mcost by bmobil, with similar rounding. Signed-off-by: Markus Armbruster <armbru@pond.sub.org>
4 lines
116 B
Text
4 lines
116 B
Text
config infrastructure
|
|
name lcms hcms bmobil cost enable
|
|
"lala" 1 1 1 1 1
|
|
# value for field 1 must be "road network"
|