Infrastructure requires lcms and hcms to build. The build materials
are exposed as infrastructure columns lcms, hcms (struct sctintrins
members in_lcms, in_hcms). They are per point of efficiency. In
contrast, sector and unit build materials are defined for 100%.
We want to define build materials for 100% now, for flexibility and
consistency, and we want to optionally support more build materials in
the future. Replace members in_lcms and in_hcms by array in_mat[],
and provide selectors l_build and h_build.
Additionally provide selectors for all other item types, with value
zero, to help clients prepare for future additional materials. Use
CA_DUMP_ONLY to keep them out of configuration tables until they
actually work.
Signed-off-by: Markus Armbruster <armbru@pond.sub.org>
Infrastructure build cost is defined by infra column dcost (struct
sctintrins member in_dcost). It's the cost per point of efficiency.
In contrast, sector and unit build cost is defined for 100%, by
sect-chr, ship-chr, plane-chr, land-chr, nuke-chr column cost.
Switch to build cost per 100%, for flexibility and consistency:
replace struct sctintrins member in_dcost by in_cost, and selector
dcost by cost.
With cost values that aren't multiple of 100, the build cost may have
to be rounded. Do this exactly like we round sector build cost: the
amount is limited to money * 100 / cost rounded down, but the money
charged is actual amount * money / 100 rounded randomly.
Do the same for mobility use: replace struct sctintrins member
in_mcost by in_bmobil, and selector mcost by bmobil, with similar
rounding.
Signed-off-by: Markus Armbruster <armbru@pond.sub.org>