config: Define infra build cost and mobility use per 100%
Infrastructure build cost is defined by infra column dcost (struct sctintrins member in_dcost). It's the cost per point of efficiency. In contrast, sector and unit build cost is defined for 100%, by sect-chr, ship-chr, plane-chr, land-chr, nuke-chr column cost. Switch to build cost per 100%, for flexibility and consistency: replace struct sctintrins member in_dcost by in_cost, and selector dcost by cost. With cost values that aren't multiple of 100, the build cost may have to be rounded. Do this exactly like we round sector build cost: the amount is limited to money * 100 / cost rounded down, but the money charged is actual amount * money / 100 rounded randomly. Do the same for mobility use: replace struct sctintrins member in_mcost by in_bmobil, and selector mcost by bmobil, with similar rounding. Signed-off-by: Markus Armbruster <armbru@pond.sub.org>
This commit is contained in:
parent
f9114aecd8
commit
c8b51ec1a8
8 changed files with 42 additions and 43 deletions
|
@ -1,4 +1,4 @@
|
|||
config infrastructure
|
||||
name lcms hcms dcost mcost enable
|
||||
name lcms hcms bmobil cost enable
|
||||
"lala" 1 1 1 1 1
|
||||
# value for field 1 must be "road network"
|
||||
|
|
|
@ -1,7 +1,7 @@
|
|||
config infrastructure
|
||||
name lcm hcm dcost mcost enab
|
||||
"road network" 2 2 2 1 1
|
||||
"rail network" 1 1 1 1 1
|
||||
"defense factor" 1 1 1 1 0
|
||||
name lcm hcm bmob cost enab
|
||||
"road network" 2 2 100 200 1
|
||||
"rail network" 1 1 100 100 1
|
||||
"defense factor" 1 1 100 100 0
|
||||
/con
|
||||
# malformed table footer
|
||||
|
|
Loading…
Add table
Add a link
Reference in a new issue